Large-scale vehicle-to-grid system with integrated stationary storage: harnessing EV batteries and their fast response to deliver grid services, currently provided by highly polluting gas plants

Free2Move and FCA are developing a centralized bi-directional V2G system to manage 25 MW of ultra-fast reserve services for grid stability at FCA's logistics center in Turin.

Subsidie
€ 1.643.000
2021

Projectdetails

Introduction

Recently, Free2Move esolutions (former EPS EPS eMobility) and FCA Italy S.p.A (hereinafter referred to as FCA) have been awarded a contract by the Italian transmission grid operator Terna to manage 25 MW of ultra-fast reserve services. This is part of a bigger initiative by Terna aggregating up to 230 MW of nominal capacity of Fast Reserve Units (FRU) providing frequency and voltage services to ensure grid stability.

Project Overview

In this context, Free2Move will develop and build the first large-scale centralised bi-directional V2G system (DrossOne V2G), capable of guaranteeing a Maximum Dispatchable Power of 30.8 MW. The project configuration consists of:

  • 280 double bi-directional recharging stations (2x50kW each)
  • A stationary storage system (second-life batteries)

The stationary storage not only enables the optimisation of the power and energy capacity available, but it also allows for successful regulation of the microgrid DC bus.

Location and Functionality

The V2G plant will be implemented at FCA’s Drosso logistics centre (Mirafiori, Turin), where the plant will provide grid services while newly built full electric vehicles (FIAT 500e) are parked in the stockyard before being shipped to the dealers.

Target Market

The target market is to deliver ancillary and energy services, all within the compliant response times required by Terna. Free2Move's innovative centralised charging solution, coupled with the Energy Management System, optimises energy and power flows. This system is based on a DC microgrid architecture, which allows for:

  1. Easy connection and increased synergies between distributed energy resources
  2. Optimisation of energy consumption
  3. Provision of innovative Behind-the-Meter and Front-the-Meter (i.e., grid) services

Indeed, electric vehicle fleets using a physical connection are able to provide different services to the distribution and transmission grid with very fast response times (<200 ms).

Initial Stage

In a first stage, the V2G platform will deliver the new fast reserves service (ultra-fast frequency response) and a pool of real-time (RT) services.

Financiële details & Tijdlijn

Financiële details

Subsidiebedrag€ 1.643.000
Totale projectbegroting€ 1.643.000

Tijdlijn

Startdatum1-5-2021
Einddatum30-6-2028
Subsidiejaar2021

Partners & Locaties

Projectpartners

  • FREE2MOVE ESOLUTIONS SPApenvoerder

Land(en)

Italy

Vergelijkbare projecten binnen Innovation Fund

Innovation F...

First European Large-Scale Vehicle-To-Grid Demonstrator for an efficient decarbonisation of the energy sector

The EVVE project aims to demonstrate large-scale Vehicle-To-Grid technology in France, reducing GHG emissions by over 25,000 tons while optimizing EV battery use for grid services.

€ 3.794.496
Innovation F...

Assembly plant for serial production of industrial energy storage systems based on second-life car batteries and disruptive full-pack technology.

FENECON's CarBatteryReFactory project aims to scale up the production of innovative, standardized energy storage systems using second-life vehicle batteries to enhance sustainability and reduce GHG emissions.

€ 4.499.400
Innovation F...

airPort sustaInability secONd lifE battEry stoRage

The project aims to integrate second-life EV batteries into Rome Fiumicino Airport's power supply, enhancing energy storage and reducing emissions while supporting solar energy utilization.

€ 3.102.623
Innovation F...

Green the Flex: Achieving significant greenhouse gas emission reductions by intelligent electricity load shifting on the customer level.

The project aims to aggregate over 2500 decentralized residential energy units to optimize demand and generation, enabling participation in flexibility markets and reducing CO2 emissions.

€ 2.418.000
Innovation F...

Decarbonising temporary power & flexible storage

NorthFlex aims to launch the Voltpack Mobile System, an innovative lithium-ion BESS that enhances temporary power generation and energy storage, targeting significant CO2 reductions and market disruption.

€ 4.427.807

Vergelijkbare projecten uit andere regelingen

Mkb-innovati...

V2G slim laden

Jedlix onderzoekt de inzet van elektrische auto’s als batterij voor het elektriciteitsnet via Vehicle 2 Grid om de energietransitie naar duurzame energie te versnellen.

€ 20.000
2.2 - Bevord...

Elke E-truck Verdient een Lading

Het project ontwikkelt een netonafhankelijke laadfaciliteit voor E-trucks, gebruikmakend van lokale, fossielvrije energiebronnen.

€ 593.121
Mkb-innovati...

Vehicle-2-Microgrid-2-Vehicle

Onderzoek de haalbaarheid van een V2M2V-netwerk om V2G- en V2V-technologieën effectief te integreren voor innovatieve energieoplossingen.

€ 20.000
EIC Accelerator

Scaling the largest VPP made of EVs

Deftpower aims to launch a plug-and-play virtual power plant for EVs, enabling demand response and grid flexibility while monetizing EVs for owners and enhancing sustainable energy use in Europe.

€ 2.499.999
Mkb-innovati...

TOTAL E-GRID

Het project ontwikkelt een schaalbare oplossing voor de elektrificatie van de logistieke sector, met een dynamisch laadplein dat efficiëntie en laadervaring optimaliseert voor e-Trucks.

€ 102.012