EFFILOAT: Efficient From Fabrication to Installation of Large Offshore Assembled Turbines

Het EFFILOAT-project versnelt de bouw van offshore windparken door innovatieve marshalling- en installatieoplossingen te ontwikkelen, gericht op kostenreductie en efficiëntie in de toeleveringsketen.

Subsidie
€ 3.668.863
2025

Projectdetails

Aanleiding

To meet ambitious offshore wind energy goals, the construction of wind parks must accelerate, with larger turbines (up to 20MW) and heavier components (monopiles up to 3,500 tons) expected by 2030.

These challenges impact the offshore wind supply chain, especially at marshalling yards where logistical complexities arise due to the size and weight of components.

Solutions include:

  • Innovation in handling tools
  • Standardization of support structures
  • Industrialized processes to improve efficiency

A collaborative, step-by-step approach aims to optimize transport, storage, and installation, reducing costs and increasing installation speeds.

Doelstelling

The project's objective is to speed up the building of offshore wind-energy parks by introducing a system innovation within the marshalling and installation of large future offshore wind foundations and turbines.

This aims at reaching efficiencies in terms of time, space, and costs. By taking a holistic approach on the transport and installation of wind turbines and their foundations, we can consider all steps that generate new handling and installation methods.

These methods not only fit the purpose of producing energy at lower costs but also optimize the supply chain and logistics to ensure timely (ASAP) operations of offshore Wind Turbine Generators, preventing delays.

By bringing marshalling and wind-foundation installation solutions to a new and cost-efficient level, the EFFILOAT project is providing solutions to efficiently increase and speed up logistics within the (offshore) wind supply chain, leading to affordable and safe operations of sustainable energy production.

Korte omschrijving

The EFFILOAT project targets the MOOI-mission 1, electricity. This mission is dedicated to tackling the greatest challenges of upscaling offshore wind energy, which contributes to an efficient and all-embracing logistic offshore energy system.

The EFFILOAT project specifically addresses the first innovation theme of the MOOI-electricity-mission: Innovations that accelerate the deployment of wind energy at sea and remove obstacles.

Within this theme, the EFFILOAT project is based on the following subthemes:

  1. Acceleration of the construction of offshore wind parks
  2. Circularity of components and raw materials

Resultaat

The project is structured along 3 project results:

  • Result 1: System Innovation for reduction of supply chain process bottlenecks
  • Result 2: Foundation related transport and installation concepts
  • Result 3: WTG Assembly related transport and installation concepts

Financiële details & Tijdlijn

Financiële details

Subsidiebedrag€ 3.668.863

Tijdlijn

Startdatum2-1-2025
EinddatumOnbekend
Subsidiejaar2025

Partners & Locaties

Projectpartners

  • Baggermaatschappij Boskalis B.V.
  • GustoMSC B.V.
  • Heavy Duty Pavements B.V.
  • Mammoet Holding B.V.penvoerder
  • Royal Roos Holding B.V.
  • Techn. Universiteit Delft

Land(en)

Netherlands

Vergelijkbare projecten binnen MOOI

MOOI

Local Inclusive Future Energy (LIFE) City Platform

Het LIFE-project ontwikkelt een district-scale energiebeheerplatform om netproblemen op te lossen, lokale duurzame energie te integreren en de energietransitie te versnellen door flexibiliteit en inclusiviteit te bevorderen.

€ 4.358.098
MOOI

SmoothEMS met Gridshield

Het project ontwikkelt een schaalbaar Energiemanagementsysteem (EMS) met GridShield om congestie in het elektriciteitsnet te verminderen en de energietransitie te ondersteunen.

€ 2.419.551
MOOI

High Impact Low Effort Energietransitie Installaties

Het project ontwikkelt een schaalbaar en energiezuinig renovatieconcept voor sociale woningen, gericht op het versnellen van de energietransitie met innovatieve installaties en verbeterd wooncomfort.

€ 1.332.782
MOOI

Gebouwde Omgeving Elektrificatie Innovatieplatform

Het GO-e project ontwikkelt schaalbare flexibiliteitsdiensten en protocollen om netcongestie te voorkomen, met focus op samenwerking tussen stakeholders en participatie van gebruikers, voor 2025.

€ 5.301.831

Vergelijkbare projecten uit andere regelingen

DEI+

Demonstration of the Wind Turbine Maintenance Crane

Mammoet ontwikkelt een innovatieve lichte WTM-kraan voor windturbineonderhoud, die kosten en tijd reduceert, met als doel de offshore windmarkt te betreden en economische groei te stimuleren.

€ 91.760