First German inland cement plant Geseke becomes net carbon negative by implementing a full CCS chain

GeZero is a pioneering CCS project aiming to achieve nearly 100% GHG emission avoidance at a cement plant in Germany by capturing and storing 700,000 tCO2e annually, while promoting renewable energy use.

Subsidie
€ 190.905.744
2024

Projectdetails

Introduction

GeZero (Geseke Zero Emissions) is a full-chain and a full-scale Carbon Capture and Storage (CCS) project (from source to sink) for Geseke, a Heidelberg Materials cement plant in North Rhine-Westphalia (Germany). The project plans to build a new second generation Oxyfuel kiln on an industrial scale. This will be combined with several innovations to improve the technical, economical, and environmental performance of the plant, leading to approximately 100% relative GHG emission avoidance compared to the reference scenario.

Project Overview

The first-of-its-kind project will contribute to the development of an entire CCS value chain solution for a location which is not in close proximity to the coast nor to inland carbon dioxide (CO2) storage options.

Operational Goals

Starting to operate in 2029, the project aims to safely capture and store approximately 700,000 tonnes of CO2 equivalent (tCO2e) annually beneath the North Sea. This is equivalent to about 3.5% of the annual CO2 emissions of the German cement industry, or the yearly average CO2 footprint of 66,700 Germans (calculated according to the Federal Environment Agency, 2023). The project is expected to transform the Geseke plant into one of the first fully decarbonised European plants to produce cement and clinker.

Technical Innovations

The project includes a new cutting-edge oxyfuel kiln combined with upstream Oxygen (O2) production through an Air Separation Unit (ASU).

CO2 Processing

The purification (concentration) and liquefaction of the CO2 will take place in a Cryogenic Processing Unit (CPU). GeZero's logistical concept includes rail loading and interim storage facilities.

Transportation

The CO2 will be transported via train to Wintershall Dea's hub CO2nnectNow in Wilhelmshaven and from there via ship and pipeline to the final permanent storage site. This transport solution by rail will bridge the gap until a CO2 pipeline infrastructure is available.

Energy Demand

The electrical energy demand will be met exclusively by renewable energy. For example, a new solar farm at the factory premises will help to cover a small portion of this demand. In addition, biomass will be used for thermal energy generation and to capture the associated CO2, which will create so-called negative emissions, thus sustainably contributing to the EU's CO2 reduction targets.

Climate Goals Contribution

GeZero contributes significantly to reaching the climate goals of the industrial sector and to establishing a future carbon management infrastructure.

Energy Transition

In addition, due to its demand for green energy, the project underlines the need for energy transition and aims to be part of the solution by installing its own solar power farm.

Local Impact

GeZero will serve as a CO2 collection hub for smaller local emitters, giving them access to intermediate storage and rail loading infrastructure. Located near four other cement plants, GeZero plays a crucial role in helping make this part of Germany a model region for climate-neutral cement production, ensuring the creation of future-proof jobs.

Financiële details & Tijdlijn

Financiële details

Subsidiebedrag€ 190.905.744
Totale projectbegroting€ 190.905.744

Tijdlijn

Startdatum1-1-2024
Einddatum31-12-2033
Subsidiejaar2024

Partners & Locaties

Projectpartners

  • HEIDELBERG MATERIALS AGpenvoerder

Land(en)

Germany

Vergelijkbare projecten binnen Innovation Fund

Innovation F...

Towards a carbon negative large-scale clinker plant through first-ever demonstration of a groundbreaking flue gas recirculation & concentration-based concept paired with a full CCS solution

The GO4ZERO project aims to implement a carbon-negative clinker kiln in Belgium using oxy-combustion and CCS, producing over 2.3 million tonnes of carbon-neutral cement annually while avoiding 10 million tonnes of CO2 emissions.

€ 230.000.000
Innovation F...

KOdeCO net zero

The KOdeCO net zero project aims to establish the first net zero cement plant in Croatia, utilizing innovative carbon capture technology to achieve significant GHG emissions reductions and promote sustainable industry practices.

€ 116.926.000
Innovation F...

Carbon2Business

The Carbon2Business project aims to implement advanced carbon capture technology at Holcim's Lägerdorf cement plant to reduce emissions by 128% and supply captured CO2 as raw material to local industries.

€ 109.816.528
Innovation F...

K6 Program

The K6 Program aims to create Europe's first carbon neutral cement by transforming a historic plant with innovative technology, reducing emissions by 8.1 Mt CO2e over ten years.

€ 153.386.598
Innovation F...

Improved calcination and carbon capture for the largest lime plant in Europe

The Everest project aims to decarbonize Europe's largest lime plant by implementing innovative carbon capture and storage technologies, achieving 89% GHG emission reduction and creating a CO2 supply chain.

€ 228.721.665

Vergelijkbare projecten uit andere regelingen

LIFE Standar...

Full-scale demonstration of carbon capture and storage in Glass manufacturing to limit furnace CO2 emissions

GLASS2LIFE aims to develop an innovative CO2 capture process for glass manufacturing, achieving 80% sequestration to support EU climate neutrality by 2050 and enabling replication in other industries.

€ 6.719.887
EIC Pathfinder

Highly Efficient Reactor for Conversion of CO2 and H2O to Carbon Neutral Fuels and Chemicals

The project aims to develop a modular reactor technology for synthesizing carbon-neutral fuels and chemicals from CO2 and H2O using renewable energy, promoting sustainability and industrial integration.

€ 2.250.500
ERC Proof of...

CO2 Mineralisation: Conversion of Waste to New Building Materials

MIN CO2 aims to develop a sustainable method for converting noncombustible waste into low CO2 footprint building materials, enhancing carbon capture and generating income through innovative technology.

€ 150.000
Versnelde kl...

CO2-vrij industrieel warmtesysteem middels warmtepomp, warmteopslag en restwarmtebenutting

Coca-Cola European Partners vervangt de gasgestookte stoominstallatie in Dongen door CO2-neutrale systemen om in 2023 aardgasvrij te worden en jaarlijks 2.420 ton CO2 te reduceren.

€ 1.863.000
Mkb-innovati...

“Aerocycle” a new way for CO2 gas removal

Het project ontwikkelt een natuurlijke methode voor CO2-afvang via enhanced weathering, wat leidt tot negatieve emissies, schonere lucht en lagere energiekosten.

€ 20.000