Anubis Project

Het Anubis-project demonstreert de inzet van afgedankte busbatterijen voor stationaire energieopslag, wat leidt tot hoogwaardig recyclen en significante CO2-reductie in Nederland.

Subsidie
€ 476.760
2021

Projectdetails

Aanleiding

The transport sector is changing rapidly from being highly fossil-fuel dependent to being electricity-driven. Based on the assumption that after 2030, all cars, trucks and busses will be electrical, more than 150,000 tons of batteries will become available for recycling within the Netherlands each year.

These batteries are currently classified as waste products and sent to recycling facilities abroad. However, these batteries could have a second life: they hold enough capacity to be used in stationary applications. Stationary storage is a key element in the transition to a zero-carbon energy system.

By recycling the batteries at a higher grade (defined as first being used in a stationary application) compared to conventional recycling, the battery resources are used more efficiently. By doing so, a significant amount of CO2 reduction can be achieved. To be able to do this, certain barriers and technical challenges need to be overcome.

Doelstelling

The goal of this project is to demonstrate and validate an innovative bus battery-based stationary energy storage plant for large scale rollout as a contribution to the high-grade recycling of bus batteries in the Netherlands.

With the Anubis project, RWE aims to show that existing barriers and technical challenges can be overcome and that knowledge and experience regarding the construction and operation of the plant can be gained. This will lead to CO2 emission reduction in the Netherlands, as the batteries are recycled at a high-grade.

Conventional recycling is delayed until less CO2 intensive recycling methods are available, and using batteries as stationary storage improves the balance between electricity demand and the variable supply of renewable energy production.

Korte omschrijving

In the Anubis project, RWE will lease end-of-life bus batteries. These batteries will be used in a demonstration installation, which will be used to balance the transmission network.

The activities as part of this demonstration are als follows:

  1. The batteries will be tested in preparation for the demonstration.
  2. RWE will apply for and obtain the relevant permits.
  3. Conduct detailed engineering of the plant and secure contracts and offers.
  4. Start with the construction and commissioning of the plant.
  5. Finally, the plant will be tested and validated, after which conclusions will be drawn on the lessons learned from the process.

All activities will be carried out by RWE itself, in collaboration with the supplier of the batteries.

Resultaat

The end result of the project is a fully functional demonstration Battery Energy Storage System (BESS) based on 2nd life bus batteries. The system is unique in the Netherlands and will result in:

  • Effective high-grade recycling of bus batteries into a 2nd life situation.
  • Significant CO2 reductions compared to conventional recycling.
  • An effective increase in the recycling of waste streams.

In addition, technical knowledge will be gained on the functioning of RWE's system and the project is used as an example to other e-mobility manufacturers that the batteries coming from their products can be recycled high grade.

Financiële details & Tijdlijn

Financiële details

Subsidiebedrag€ 476.760

Tijdlijn

Startdatum7-1-2021
EinddatumOnbekend
Subsidiejaar2021

Partners & Locaties

Projectpartners

  • RWE Generation NL B.V.penvoerder

Land(en)

Netherlands

Vergelijkbare projecten binnen DEI+

Demonstratie...

Oranjewind Inertia

Het 'Oranjewind Inertia' project ontwikkelt en test een batterij-energiesysteem om inertia en netdiensten te bieden, ter ondersteuning van de overgang naar hernieuwbare energie en CO2-reductie.

€ 800.828
Demonstratie...

Vlakplaattractiebatterijen voor aFRR

Het project ontwikkelt een innovatieve loodzuur vlakplaattractiebatterij en een aggregatorplatform om duurzame energieopslag te optimaliseren, congestie te verminderen en de energietransitie te ondersteunen.

€ 440.813
Demonstratie...

RHINO

Dit project demonstreert een 12MW batterij en hybride forecastmodel om duurzame energieopslag te optimaliseren, curtailment te verminderen en bij te dragen aan een stabieler energienet in Nederland.

€ 2.772.291
Demonstratie...

Ore Energy Battery: Fully scalable, ultra-cheap and easily deployable stationary long-duration energ

Het project ontwikkelt en test twee innovatieve batterijoplossingen van 10 kWh en 50 kWh voor energieopslag, gericht op het verbeteren van de integratie van hernieuwbare energie in het energienet.

€ 1.956.618
Demonstratie...

Exergy circulaire batterijen met PV voor hoge CO2 reductie

Het project ontwikkelt een veilige en duurzame batterijtechnologie voor zonne-energie, gericht op CO2-reductie en verhoogde zelfconsumptie, met pilotinstallaties en fabricagelijn.

€ 1.982.382

Vergelijkbare projecten uit andere regelingen

Missiegedrev...

SymBatt

SymBatt ontwikkelt een geïntegreerde keten voor hernieuwbare energieopwekking, opslag en waterstofconversie om CO2-reductie en leveringszekerheid te realiseren.

€ 3.274.871
Missiegedrev...

Energy Control Businesspark – Ecofactorij

Het project ontwikkelt een schaalbaar, semi-autonoom lokaal energiesysteem (SALECS) om netcongestie te verminderen en duurzame energieproductie op bedrijventerreinen te optimaliseren.

€ 3.251.249